Skip to main content

Current Opening

Featured Post

does apprenticeship count as work experience or not ?

  Does 01 year apprenticeship training will count as a work experience? I know, many student have this doubt that whether apprenticeship training will count as a work experience or not ? and it should be. So let me tell you today and clear your doubt about apprenticeship training  count as a work experience .  W ell, when I also completed my apprenticeship training, I had also this doubt in my mind. Then I searched and read about it many places and finally I got the proof of  apprenticeship training will count as a work experience.  My finally answer is YES  apprenticeship training will count or consider as a work experien ce. I share with you the proof this.    Click Here   (Go to  http://portal.mhrdnats.gov.in > Help > Process Manual (English) > Page No. 16 > Benefits to students > Point No. 10) Note:- The apprentice which is under the Ministry of Skill Devlopment & Entrepreneurship, in which the All india ...

Latest Notifications



𝗪𝗛𝗘𝗡 𝗗𝗢𝗘𝗦 𝗔 𝗦𝗟𝗔𝗕 𝗙𝗔𝗜𝗟


𝗪𝗛𝗘𝗡 𝗗𝗢𝗘𝗦 𝗔 𝗦𝗟𝗔𝗕 𝗙𝗔𝗜𝗟?

A slab might look like a simple flat surface, but it performs one of the most complex roles in a structure, distributing loads efficiently and ensuring occupant safety and comfort. When design precision or site discipline slips, even slightly, a slab begins to show signs of distress.

In engineering, slabs remind us that 𝗳𝗮𝗶𝗹𝘂𝗿𝗲 𝗶𝘀 𝗻𝗲𝘃𝗲𝗿 𝘀𝘂𝗱𝗱𝗲𝗻: 𝗶𝘁’𝘀 𝗯𝘂𝗶𝗹𝘁 𝘀𝗹𝗼𝘄𝗹𝘆, 𝘄𝗵𝗲𝗻 𝘀𝗺𝗮𝗹𝗹 𝘀𝘁𝗲𝗽𝘀 𝗮𝗿𝗲 𝗶𝗴𝗻𝗼𝗿𝗲𝗱.


CAUSES OF SLAB  FAILURE :- 




𝗢𝘃𝗲𝗿𝗹𝗼𝗮𝗱𝗶𝗻𝗴:- Slabs are designed for specific live and dead loads. Adding extra weight from storage, partitions, or flooring can exceed capacity, causing cracks and deflection.


𝗣𝗼𝗼𝗿 𝗖𝘂𝗿𝗶𝗻𝗴:- Concrete gains strength through hydration. Inadequate curing stops this process midway, leaving the slab weak, porous, and more prone to cracking.


𝗥𝗲𝗶𝗻𝗳𝗼𝗿𝗰𝗲𝗺𝗲𝗻𝘁 𝗘𝗿𝗿𝗼𝗿𝘀:- Incorrect bar spacing, insufficient cover, or misplacement of steel disrupts how tension is resisted, leading to flexural or shear cracks.


𝗜𝗺𝗽𝗿𝗼𝗽𝗲𝗿 𝗦𝘂𝗽𝗽𝗼𝗿𝘁 𝗮𝗻𝗱 𝗙𝗼𝗿𝗺𝘄𝗼𝗿𝗸 𝗥𝗲𝗺𝗼𝘃𝗮𝗹 :- Removing props too early transfers load before the concrete gains adequate strength, causing permanent deflection.


𝗗𝗲𝘀𝗶𝗴𝗻 𝗢𝘃𝗲𝗿𝘀𝗶𝗴𝗵𝘁𝘀:- Ignoring span-to-depth ratios, shrinkage control, or serviceability limits may result in excessive sagging or visible cracking under normal use.


𝗧𝗛𝗘 𝗘𝗔𝗥𝗟𝗬 𝗪𝗔𝗥𝗡𝗜𝗡𝗚 𝗦𝗜𝗚𝗡𝗦:-  

Uneven deflection, fine surface cracks, or a “hollow” sound when tapped often indicate internal weakness. Early detection allows engineers to act before structural integrity is compromised.

I realized that a slab’s strength doesn’t come from its thickness - it comes from 𝗮𝘁𝘁𝗲𝗻𝘁𝗶𝗼𝗻 𝘁𝗼 𝗱𝗲𝘁𝗮𝗶𝗹. Reinforcement layout, curing discipline, and load awareness all work together silently.



Prevent Slab Failure:-



Comments

Popular Posts

UJVNL JE CIVIL SOLVED PAPER

Overseer Civil Solved Paper

Auto CAD

Previous Year Solved Paper

does apprenticeship count as work experience or not ?

Engineering Drawing Objective Type Questions

Support this ▶️ Channel !